DOC - Permit Finaled | | | 1/13/2020 | | DONE |
|
|
|
pass final on 1/10/20
|
DOC - Permit Finaled | | | 1/13/2020 | | DONE |
Mark Stumbaugh
|
|
|
|
INSP-Final Inspection | 1/8/2020 | 1/10/2020 | 1/10/2020 | P | PASS |
Troy Cobbley
|
|
|
*PASS One escutcheon needed to be replaced due to being painted which Gabe replaced. Signs mounted, and irrigation tied into the flowswitch. Alarm timed out at 43sec. MAS**
Gabe Garduno is the contact for this Final Inspection. Thank you for your help Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 1/8/2020 | 1/9/2020 | 1/9/2020 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro witnessed with no pressure loss.
Gabe Garduno is the contact for his O Hydro inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 1/8/2020 | 1/9/2020 | 1/8/2020 | A | CANC |
Troy Cobbley
|
|
|
Gabe Garduno is the contact for this O Hydro Inspection. Thank you for your help. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
|
INSP-Final Inspection | 1/2/2020 | 1/3/2020 | 1/3/2020 | P | CANC |
Troy Cobbley
|
|
|
Gabe Garduno is the contact for this final inspection. He is hoping for an appointment in the PM. We appreciate your help. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in/Hydro | 1/2/2020 | 1/3/2020 | 1/3/2020 | A | FAIL |
Troy Cobbley
|
|
|
No water on site. No inspection performed.
Gabe Garduno is the contact for this Overhead Hydro inspection. He is hoping for an appointment in the AM. Thank you so much for your help. We appreciate it. Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 11/13/2019 | 11/14/2019 | 11/14/2019 | A | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping can be covered.
Gabe is the field contact. Thanks for all your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 11/13/2019 | 11/13/2019 | 11/13/2019 | P | PART |
Troy Cobbley
|
|
|
Rough-in passed. Tenting failed. No piping to be covered. Water supply not connected yet.
Gabe is the field contact. Thanks for all you do! Phone #: ###-#### Inspection requested via web by Stan Beus
|