INSP-Final Inspection | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work complete.
Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 1/16/2020 | 1/17/2020 | 1/17/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
Plans are on site Phone #: ###-#### Inspection requested via web by Sam Ball
|