INSP-Final Inspection | 1/20/2020 | 1/23/2020 | 1/23/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 1/17/2020 | 1/23/2020 | 1/20/2020 | A | CANC |
Troy Cobbley
|
|
|
Needs to be done at 7:30 am Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
INSP-Sprinkler Rough-in | 12/30/2019 | 12/31/2019 | 12/31/2019 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping in scope of work complete, approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|