INSP-Sprinkler Rough-in/Hydro | 7/29/2020 | 7/29/2020 | 7/29/2020 | P | PART |
Jim Page
|
|
|
Hydrostaic test for remote FDC and underground supply witnessed, no pressure loss observed at gauge provided on the remote FDC. Could not complete overhead hydro, still have more heads/piping to be installed after finish ceilings.
Overhead rough/hydro, underground hydro, FDC underground hydro, call James to coordinate a time. Thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Supply line flush | 7/20/2020 | 7/21/2020 | 7/21/2020 | A | DONE |
Jim Page
|
|
|
Main line flush complete to include remote FDC piping.
Call James if anything comes up, scheduled for 9am with Stacy/SUEZ and Jim Page. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 1/14/2020 | 1/15/2020 | 1/15/2020 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply and remote FDC complete, approved for cover.
Underground rough to cover. Call James before heading out. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|