INSP-Final Inspection | 4/1/2020 | 4/3/2020 | 4/3/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|
INSP-Final Inspection | 2/13/2020 | 2/14/2020 | 2/14/2020 | P | FAIL |
Troy Cobbley
|
|
|
Tested the two smoke detectors as shown on the plans but an additional detector is needed on the other side of the beam that splits the room in two.Provide as-builts prior to the next inspection.
Contact is Dan. Phone #: ###-#### Inspection requested via web by Morgan Ahten
|