INSP-Final Inspection | 3/24/2020 | 3/27/2020 | 3/27/2020 | P | PART |
Jim Page
|
|
|
Inspected/tested unoccupied apartments, tested initiating devices in common cooridors as well as sprinkler monitoring, all tested satisfactorily. Audio visual notification tested throughout building with exception to apartments still being repaired, rooms still being repaired were not tested, rooms do have active fire sprinkler protection. Based on inspection and verbal conversation with Todd C. with the Boise Fire Department, fire watch can be lifted. Fire panel is active as well as monitoring, finalization of remaining items to be completed at a later date.
This is an occupied facility and we have been given a window of between 3-4 pm to get this done. This is a partial to get them off fire watch until the final. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
INSP-Final Inspection | 1/28/2020 | 2/4/2020 | 2/4/2020 | A | CANC |
Jim Page
|
|
|
Inspection scheduled for the wrong date, this request is cancelled per conversation with point of contact.
Needs to be @ 7 am as the building is occupied. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|