INSP-Final Inspection | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work complete.
Needs to be done at 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 2/6/2020 | 2/7/2020 | 2/7/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection fo r overhead fire sprinkler piping in scope of work complete, scope of work approved for cover.
Needs done by 7:00am Phone #: ###-#### Inspection requested via web by Sam Ball
|