INSP-Final Inspection | 6/22/2020 | 6/23/2020 | 6/23/2020 | A | PASS |
Troy Cobbley
|
|
|
permit finaled.
Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 6/22/2020 | 6/23/2020 | 6/23/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed for the Mech. Room. Ceiling has been installed.
GC has completed mechanical room ceiling. Please contact GC superintendent Rick for time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 6/10/2020 | 6/11/2020 | 6/11/2020 | A | PASS |
Troy Cobbley
|
|
|
All piping ok for cover. I spoke to building contractor about providing complete ceiling in the MECH Room. Please contact Rick Fry for inspection time. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|
INSP-Sprinkler Rough-in | 5/6/2020 | 5/6/2020 | 5/6/2020 | P | PASS |
Troy Cobbley
|
|
|
The piping above the two hardlids is ok for cover.
Screened- Rick Phone #: ###-####
|