INSP-Final Inspection | 4/28/2020 | 4/29/2020 | 4/29/2020 | A | PASS |
Jim Page
|
|
|
Annual inspection has been completed and accelerator was in operational state at time of inspection. Final fire sprinkler inspection for area of work is complete.
Contact: Steven Vaughn Phone #: ###-#### Inspection requested via web by Hunter Fillmore
|
INSP-Final Inspection | 4/28/2020 | 4/28/2020 | 4/28/2020 | P | CANC |
Jim Page
|
|
|
Rescheduled for 29APR2020 to coincide with fire alarm inspection per conversation with Fidel, Steve was not available at time of phone call, this request is cancelled.
Contact: Steven Vaughn Phone #: ###-#### Inspection requested via web by Hunter Fillmore
|
INSP-Sprinkler Rough-in | 4/21/2020 | 4/22/2020 | 4/22/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping is complete, cover is approved for area of work. Accelerator is turned off on dry system and last annual inspection was completed on 12MAR2019, accelerator needs to be operational and annual inspection needs to be accomplished before final inspection.
Contact: Ricky Sullivan Phone #: ###-#### Inspection requested via web by Hunter Fillmore
|