INSP-Final Inspection | 6/3/2020 | 6/3/2020 | 6/3/2020 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled.
BRAD IN OFFICE IS CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Sprinkler Rough-in | 5/19/2020 | 5/20/2020 | 5/20/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. The remaining piping is ok for cover. ###-#### IS GENE LANDONS PHONE NUMBER. HE IS THE SUPERINTENDENT FOR JORDON WILCOMB CONSTRUCTION. IF YOU CANTY GET A HOLD OF HIM CALL RICK FRY FORM TVFP ###-#### Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
INSP-Sprinkler Rough-in | 5/12/2020 | 5/13/2020 | 5/13/2020 | A | PASS |
Troy Cobbley
|
|
|
Piping above the hard lids is ok for cover.
Kerry Phone #: ###-####
|