INSP-Final Inspection | 5/8/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for scope of work is complete.
We would like to perform this with other inspections on site this am. GC will be available for access please call Jeff if there are questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 5/8/2020 | 5/8/2020 | 5/8/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for scope of work is complete, cover is approved.
We would like to perform this with other inspections on site this am. GC will be available for access please call Jeff if there are questions. Phone #: ###-#### Inspection requested via web by Jeff Packham
|