INSP-Sprinkler Rough-in | 7/15/2020 | 7/15/2020 | 7/15/2020 | P | FAIL |
Jim Page
|
|
|
Inspection request for underground cover, not overhead, scope of work needs to be scheduled under the correct permit.
Bryan Collins is the contact Phone #: ###-#### Inspection requested via web by Stan Beus
|
INSP-Sprinkler Rough-in | 5/20/2020 | 5/21/2020 | 5/21/2020 | A | PART |
Jim Page
|
|
|
Rough in inspection for elevator pit heads complete, approved for cover.
Tony Cetani is the contact. The inspection is for the elevator pit Phone #: ###-#### Inspection requested via web by Stan Beus
|