INSP-Sprinkler Rough-in/Hydro | 6/24/2020 | 6/25/2020 | 6/25/2020 | A | PASS |
Troy Cobbley
|
|
|
Rough/hydro/tenting passed. Piping can be covered. , call Anthony before heading out, he will meet you there with the updated approved plans - will take him 30 minutes to get up there. Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in/Hydro | 6/17/2020 | 6/18/2020 | 6/18/2020 | A | FAIL |
Troy Cobbley
|
|
|
Plan mods are needed since 1" piping was installed not the approved 3/4", missing pendant in one room, pipe has been sprayed with foam. Inspection stopped.
Overhead rough/hydro/tenting, call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|