INSP-Final Inspection | 7/23/2020 | 7/23/2020 | 7/23/2020 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work is complete.
|
INSP-Sprinkler Rough-in/Hydro | 7/23/2020 | 7/23/2020 | 7/23/2020 | A | CANC |
Jim Page
|
|
|
|
INSP-Sprinkler Rough-in | 7/1/2020 | 7/2/2020 | 7/2/2020 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for area of work complete, approved for cover.
Austin Phone #: ###-####
|
INSP-Sprinkler Rough-in | 6/25/2020 | 6/26/2020 | 6/26/2020 | A | PASS |
Troy Cobbley
|
|
|
See city approved plans for two locations where the sprinkler piping is ok to cover above the hard lids.
Please contact Adam for inspection time. This inspection for 2 sprinkler heads in hard lids. Phone #: ###-#### Inspection requested via web by Daniel Buccino
|