INSP-Sprinkler Rough-in | 8/12/2020 | 8/13/2020 | 8/13/2020 | P | PASS |
Jim Page
|
|
|
Rough in inspection is complete, all tenting in place at time of inspection, cover is approved. Cover sticker has been placed.
tenting Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
INSP-Sprinkler Rough-in | 8/10/2020 | 8/10/2020 | 8/10/2020 | P | PART |
Jim Page
|
|
|
Rough in inspection is complete, no tenting installed at time of inspection, cover is cot approved.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|