Permit Information
Permit NumberFIR20-00452
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 8000 S FEDERAL WAY
Project NameMICRON BUILDING 32 TI
Customer Number 
ePlanReviewYes
Description
SHILO TO ADD HEADS ON 48" FLEXIBLE DROPS ACCORDING TO NEW CEILINGS AND WALLS. SHILO TO INSTALL TWO NEW LINES AFTER DEMOLISHING TWO OLD LINES ON THE SOUTH END OF THE BUILDING. SHILO TO INSTALL AN AUTOMATIC AIR PURGE VALVE AT THE HIGHEST POINT IN THE SYSTEM.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in/Hydro7/23/20207/24/20207/24/2020PPART
DetailsJim Page
Hydrostatic test for south system has been witnessed, no pressure loss observed at riser provided gauge.

Austin Farnworth is the contact. Thanks you so much for all your help. Stay safe!! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/13/20207/13/20207/13/2020PPART
DetailsJim Page
Area inspected and approved for cover are notated with red ink on the city approved drawings.

Austin Farnworth is the contact. Please call ahead so he can meet you out there. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in7/8/20207/9/20207/9/2020PPASS
DetailsTroy Cobbley
See the city approved plans for locations/hardlids marked ok where piping is ok for cover.

Austin Farnworth is the contact. Thanks Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in8/13/20208/18/2020 A 
DetailsJim Page
Austin Farnworth is the contact. This RTC is for the South Open Offices. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in8/13/20208/14/2020 A 
DetailsJim Page
Austin Farnworth is the contact. This RTC is for the south offices. Thank you for your hard work! Phone #: ###-#### >> Inspection requested via web by Stan Beus