INSP-Final Inspection | 4/24/2001 | 4/24/2001 | 4/24/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 4/24/2001 4:25:45 PM
|
INSP-Alarm Testing | 11/22/1999 | 11/23/1999 | 11/23/1999 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 17:58:47. Contact: ###-####. Reinsp. Ok on fire alarm system.
|
INSP-Final Inspection | 11/22/1999 | 11/23/1999 | 11/23/1999 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/22/1999 at 17:59:46. Contact: ###-####. Final fail rotate fire hydro 90* so steamer connection faces roadway.
|
INSP-Alarm Testing | 11/15/1999 | 11/18/1999 | 11/18/1999 | P | FAIL |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 16:31:39. Contact: ###-####. Alarm test fail control valve tamper mag. Door hold opens.
|
INSP-Supply line flush | 11/15/1999 | 11/18/1999 | 11/18/1999 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/15/1999 at 16:29:55. Contact: ###-####. Ok on supply line flush.
|
INSP-Sprinkler Rough-in | 10/25/1999 | 10/26/1999 | 10/26/1999 | A | FAIL |
Joe Tawney
|
|
|
brad ###-#### Fail sprinkler R/I obstruction, overspace, bracing
|
INSP-Sprinkler Rough-in | 10/25/1999 | 10/25/1999 | 10/25/1999 | P | FAIL |
Joe Tawney
|
|
|
brad ###-#### Approved plans not on site
|