INSP-Final Inspection | 2/29/2000 | 2/29/2000 | 2/29/2000 | P | PASS |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 02/29/2000 at 09:37:49. Contact: ###-####. Reinsp. ok for perm. occ.. 3/1/00 11:19:02 AM
|
INSP-Final Inspection | 2/25/2000 | 2/25/2000 | 2/25/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 02/25/2000 at 08:24:52. Contact: ###-####. Ok supply line flush of relocated PIV valve ok R/I of relocated FDC & PIV. 2/28/00 2:18:05 PM
|
INSP-Final Inspection | 1/7/2000 | 1/7/2000 | 1/7/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 01/07/2000 at 08:10:30. Contact: ###-####. Ok on sprinkler R/I and aboce and below ground hydrostatic tests.
|
INSP-Final Inspection | 1/5/2000 | 1/5/2000 | 1/5/2000 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 01/05/2000 at 08:09:17. Contact: ###-####. Ok hydro test main system. R/I of existing bldg. C/N issued.
|
INSP-Supply line flush | 12/28/1999 | 12/29/1999 | 12/29/1999 | P | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 12/28/1999 at 09:10:55. Contact: ###-####. Ok on supply line flush.
|
INSP-Supply line flush | 12/2/1999 | 12/3/1999 | 12/3/1999 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 16:01:23. Contact: ###-####. Ok on PTV installation & depth of bury on supply line.
|
INSP-Supply line flush | 12/2/1999 | 12/3/1999 | 12/2/1999 | P | CANC |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 12/02/1999 at 15:48:16. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 12/02/1999 at 16:00:05.
|
INSP-Supply line flush | 11/29/1999 | 12/1/1999 | 12/1/1999 | P | NR |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 11/29/1999 at 15:43:50. Contact: ###-####. Not ready for inspection.
|