INSP-Final Inspection | 10/1/2001 | 10/1/2001 | 10/1/2001 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 10/1/2001 12:09:10 PM
|
INSP-Sprinkler Rough-in/Hydro | 11/9/1999 | 11/9/1999 | 11/9/1999 | A | CANC |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/09/1999 at 06:41:26. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 11/09/1999 at 06:42:26.
|
INSP-Final Inspection | 11/4/1999 | 11/5/1999 | 11/5/1999 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 11/04/1999 at 15:38:57. Contact: ###-####. Ok to cover, control valves require monitoring.
|
INSP-Sprinkler Rough-in/Hydro | 10/29/1999 | 11/1/1999 | 11/1/1999 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 10/29/1999 at 10:22:10. Contact: ###-####. Hydros ok- need hangers on branch lines.
|