INSP-Final Inspection | 9/12/2001 | 9/12/2001 | 9/12/2001 | P | PASS |
Joe Tawney
|
|
|
Added by Inspector: 406 On 9/12/2001 3:36:29 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/19/2000 | 1/20/2000 | 1/20/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 01/19/2000 at 13:00:52. Contact: ###-####. Ok on above and underground hydro test. 1/20/00 4:18:56 PM
|
INSP-Sprinkler Rough-in/Hydro | 1/18/2000 | 1/19/2000 | 1/19/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 01/18/2000 at 16:42:54. Contact: ###-####. Ok on sprinkler R/I. 1/19/00 1:43:18 PM
|
INSP-Supply line flush | 1/17/2000 | 1/18/2000 | 1/18/2000 | A | PART |
Joe Tawney
|
|
|
Scheduled by a contractor via Hello! on 01/17/2000 at 16:22:32. Contact: ###-####. Ok on supply line flush. 1/18/00 1:18:14 PM
|