GCB-Final | 4/13/2010 | 4/14/2010 | 4/14/2010 | A | PASS |
Dave Hannah
|
|
|
Scope of inspection: FinalContact: Dean @ ###-####
|
GCB-Final | 4/13/2010 | 4/14/2010 | 4/14/2010 | A | CANC |
Dave Hannah
|
|
|
Scope of inspection: FinalContact: Dean @ ###-####
|
GCB-Framing | 3/17/2010 | 3/18/2010 | 3/18/2010 | A | PASS |
Dave Hannah
|
|
|
Scope of Inspection: Framing for room addition. Electrical work under ELE2###-####4 (rough in completed).Site Contact: Sean - ###-####Call Sean prior to inspection for access information.
|
GCB-Framing | 3/10/2010 | 3/11/2010 | 3/11/2010 | A | NR |
Mike Jordan
|
|
|
Contact person is Shawn @ ###-####. Stii needs electrical and electrical rough in inspection prior to framing inspection. Contaced Shawn
|
GCB-Fndatn/slab ins/fld vent | 2/12/2010 | 2/16/2010 | 2/16/2010 | A | PASS |
Mike Jordan
|
|
|
FOUNDATION INSPECTIONAM IF POSSIBLE. Stemwall ok.
|
GCB-Footing | 2/10/2010 | 2/11/2010 | 2/11/2010 | A | PASS |
Dave Hannah
|
|
|
AM IF POSSIBLE. CALL Before InspectionSean: ###-#### or Don ###-####
|