GCB-Final | 5/12/2011 | 5/13/2011 | 5/13/2011 | A | PASS |
Dave Hannah
|
|
|
FinalHoward @ ###-####Call in advance - AM Inspection
|
GCB-Footing | 6/16/2009 | 6/17/2009 | 6/17/2009 | | FAIL |
|
|
|
Footing needs to be 24" down below frost depth,, contractor will take pictures and send to me to verify.
|