Permit Information
Permit NumberGCB09-00063
StatusFinaled
Name DAVE EVANS CONSTRUCTION
Site Address 5555 GLENWOOD ST
Project NameBLD2009-00078
Customer Number 
ePlanReview 
Description
(Community Christian Center) ***12/30/09 PLAN MODIFICATIONS TO INCLUDE NEW LOCATION FOR THE DRINKING FOUNTAIN(S); REVISED LIGHT FIXTURES AND LIGHTING LAYOUT IN THE WORSHIP CENTER; CHANGE TO THE CEILING INTERIOR FINISH AND ADDITION OF A RADIUS WALL/CEILING FOAM INTERFACE WITH AN APPROVED THERMAL BARRIER.***SRZ To complete interior demolition work and remodel for the new tenant in an existing 11,236 square foot, two story, existing office building. All demolition work per demolition plan to include: Patch and repair existing walls as required; Demolition of specific interior walls and doors; Remove existing floor finishes, clean and repair for new. New work to include: Construct new interior rated walls and lid for Fire Riser room; Remove an existing window and re-install so that operable sash can be opened from inside the smaller room; Post occupant load signage; replace select existing doors to change swing direction; Add panic hardware to exterior patio gate; Add wall opening headers at new wall openings; Add new window at classroom art area; Add new suspended ceiling at areas designated on plans; Add new interior and exterior lighting; new emergency lighting; and all other misc. work noted on plans. Accessible bathrooms are existing. A new certificate of occupancy with the new occupant load total is to be issued when completed and approved. NOTE: this entire building to receive installation of an Automatic Fire Sprinkler system per NFPA 13. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final1/14/20101/15/20101/15/2010APASS
DetailsDave Hannah
Contact Zach @ ###-####Pleae call Zach prior to come in for inspection.
GCB-Framing12/18/200912/21/200912/21/2009APASS
DetailsDave Hannah
Contact Dave @###-#### c/n items completed
GCB-Framing12/17/200912/18/200912/18/2009APART
DetailsMike Jordan
Contact Dave @###-####. Interior framed walls ok, except for riser room. Needs to add straps at new header. Pend elec ri. inspection. Also needs to resubmit interior finish details for worship regarding the use of foam.
GCB-Framing12/16/200912/17/200912/17/2009ANR
DetailsMike Jordan
Contact Dave @###-####. No approved plans on site. Had to call contractor for approved plans. Contractor noted that he was not ready for inspection. Contractor noted that he had thought he scheduled inspection for friday 12-18-09. Contractor to check with city.