GCB-Final | 9/14/2010 | 9/15/2010 | 9/15/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FinalContact: Lou @ ###-####
|
GCB-Final | 9/13/2010 | 9/14/2010 | 9/14/2010 | A | FAIL |
Dave Hannah
|
|
|
Scope: FinalContact: Lou @ ###-#### needs to raise handrail and install address
|
GCB-Energy | 3/19/2010 | 3/22/2010 | 3/22/2010 | A | PASS |
Dave Hannah
|
|
|
Scope of Inspection: Insulation for new houseSite Contact: Lou - ###-####
|
GCB-Framing | 3/12/2010 | 3/15/2010 | 3/15/2010 | A | CANC |
Dave Hannah
|
|
|
Scope of Inspection: Framing for new residenceContact: Lou - ###-####
|
GCB-Framing | 3/12/2010 | 3/15/2010 | 3/15/2010 | A | CANC |
Dave Hannah
|
|
|
Scope of Inspection: Framing for new residenceContact: Lou - ###-####
|
GCB-Framing | 3/12/2010 | 3/15/2010 | 3/15/2010 | A | PASS |
Dave Hannah
|
|
|
Scope of Inspection: Framing for new residenceContact: Lou - ###-#### ok to insulate
|
GCB-Fire Wall | 2/12/2010 | 2/16/2010 | 2/16/2010 | A | PASS |
Mike Jordan
|
|
|
5/8 type x rock on exterior wall, exterior side for 1hr. wall at property line.
|
GCB-Framing | 2/8/2010 | 2/9/2010 | 2/9/2010 | A | PART |
Dave Hannah
|
|
|
AM if possible ok to cover roof
|
GCB-Footing | 11/23/2009 | 11/24/2009 | 11/24/2009 | A | PASS |
Mike Jordan
|
|
|
Contact Loundry @###-####. Footing constructed as per approved plans. set backs ok.
|