GCB-Final | 7/12/2010 | 7/13/2010 | 7/13/2010 | A | PASS |
Mike Jordan
|
|
|
Scope: Final (Signature Only)Contact: Rich @ ###-####. Final ok.
|
GCB-Final | 7/7/2010 | 7/8/2010 | 7/8/2010 | A | NR |
Mike Jordan
|
|
|
Scope: FinalContact: Rich @ ###-####.Cards not signed, mech inspection failed. Needs to have cards signed to verify all finals are completed. Trades permits are not all attached and cannot verify finals on all trades. Spoke to leon with Garden City, they have been only looking at structural sign off. Noted to leon that card needs to have required final sign offs before issueing certificate of occupancies because trades permits are not all attached to building permits. Called contractor to have him reschedule all of his finals to have card signed. Also spoke to Bob Archibald about above issue.
|
GCB-Energy | 5/7/2010 | 5/7/2010 | 5/7/2010 | A | PASS |
Dave Hannah
|
|
|
ok to cover
|
GCB-Framing | 5/6/2010 | 5/7/2010 | 5/7/2010 | A | PASS |
Dave Hannah
|
|
|
Scope of inspection: Wall installation I put it down as a framing I wasn't to sure on that.Contact: Rich @ ###-####
|
GCB-Framing | 5/4/2010 | 5/5/2010 | 5/5/2010 | A | PASS |
Mike Jordan
|
|
|
Scope of inspection: Framing / Rough inContact: Rick @ ###-####Message that was left was not very clear I did call Rick and left him a message if this was for both or just a framing. Have not heard back. ok to insul
|
GCB-Footing | 4/7/2010 | 4/8/2010 | 4/8/2010 | A | PASS |
Dave Hannah
|
|
|
Scope of inspection: FootingContact person: Bill @ ###-####Customer would like 10:00 a.m. inspection please
|