GCB-Final | 10/4/2010 | 10/5/2010 | 10/5/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FinalContact: Doug @ ###-####
|
GCB-Final | 9/23/2010 | 9/24/2010 | 9/24/2010 | A | FAIL |
Dave Hannah
|
|
|
Scope: FinalContact: Doug @ ###-#### needs to drop one sink in mens rest room so the rim is 34inchs max
|
GCB-Final | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PART |
Dave Hannah
|
|
|
Scope of Inspection: FinalContact: Murray @ ###-#### talked about ada rest rooms and went over plans this was not a final but a conf
|
GCB-Final | 5/28/2010 | 6/1/2010 | 6/1/2010 | A | DEFR |
Dave Hannah
|
|
|
Foothills Christian ChurchScope of Inspection: Re-InspectionContact: Jared @ ###-#### resheduled for pm
|
GCB-Final | 3/4/2010 | 3/4/2010 | 3/4/2010 | P | NR |
Dave Hannah
|
|
|
pete - ###-#### showed up on site they are not ready for a final I walked project with pete they have several issuse with ada in rest rooms pete said he needs a plumbing final ?
|