GCB-Final | 4/14/2011 | 4/15/2011 | 4/15/2011 | A | PASS |
Mike Jordan
|
|
|
FinalSteve @ ###-####Call in advance - AM Inspection. No card to sign.
|
GCB-Energy | 10/20/2010 | 10/21/2010 | 10/21/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: EnergyContact: Steve @ ###-####
|
GCB-Framing | 9/22/2010 | 9/23/2010 | 9/23/2010 | A | PART |
Dave Hannah
|
|
|
Scope: FramingContact: Steve @ ###-#### framing ok but still needs elec pluming an mec rough ins ok to insulate after all other treades ok
|
GCB-Masonry | 9/3/2010 | 9/7/2010 | 9/7/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: MasonryContact: Robert @ ###-####
|
GCB-Masonry | 8/30/2010 | 8/31/2010 | 8/31/2010 | A | PART |
Dave Hannah
|
|
|
###-#### first 4 ft grouted solid crew working on next left rebar looks good
|
GCB-Framing | 7/28/2010 | 7/29/2010 | 7/29/2010 | A | CANC |
Tom Arcoraci
|
|
|
Scope: FramingContact: Steve @ ###-####Plans are in the small green shed located on the property needed a stemwall insp
|
GCB-Stem wall | 7/29/2010 | 7/29/2010 | 7/29/2010 | P | PASS |
Tom Arcoraci
|
|
|
Scope: FramingContact: Steve @ ###-####Plans are in the small green shed located on the property
|
GCB-Footing | 7/14/2010 | 7/15/2010 | 7/15/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FootingsContact: Steve @ ###-####
|