GCB-Final | 1/18/2011 | 1/19/2011 | 1/19/2011 | A | PASS |
Mike Jordan
|
|
|
Scope: FinalContact: Todd @ ###-####Call for access. Structural final ok. No card to sign on site. Could not verify other finasl.
|
GCB-Energy | 9/9/2010 | 9/13/2010 | 9/13/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: EnergyContact: Todd @ ###-####Call in advance
|
GCB-Framing | 9/10/2010 | 9/10/2010 | 9/10/2010 | P | PASS |
Mike Jordan
|
|
|
Scope: FramingContact: Todd @ ###-####Call in advance
|
GCB-Framing | 9/9/2010 | 9/10/2010 | 9/10/2010 | A | NR |
Dave Hannah
|
|
|
Scope: FramingContact: Todd @ ###-####Call in advance on site needs mec r/i and seal package installed
|
GCB-Footing | 8/16/2010 | 8/17/2010 | 8/17/2010 | A | PASS |
Dave Hannah
|
|
|
Scope: FootingsContact: Todd @ note this site is on fill it was tested by mti and passed ok to pour
|
GCB-Footing | 8/12/2010 | 8/13/2010 | 8/13/2010 | A | NR |
Dave Hannah
|
|
|
Scope: FootingsContact: pat @ ###-####
|
GCB-Footing | 8/11/2010 | 8/12/2010 | 8/12/2010 | A | NR |
Dave Hannah
|
|
|
Scope: FootingsContact: Pat @ ###-####
|