GCB-Final | 8/27/2012 | 8/28/2012 | 8/28/2012 | A | PASS |
Mike Jordan
|
|
|
John @ ###-#### As close to 9 a.m. as possible. Call in advance
|
GCB-Final | 8/24/2012 | 8/27/2012 | 8/27/2012 | A | NH |
Mike Jordan
|
|
|
John @ ###-####. No one at residence. locked up. Made phone call prior to arriving. No return phone call.
|
GCB-Final | 8/17/2012 | 8/21/2012 | 8/21/2012 | P | NR |
Mike Jordan
|
|
|
John @ ###-#### call in advance. Needs other trades finals first.
|
GCB-Energy | 5/4/2011 | 5/5/2011 | 5/5/2011 | A | PASS |
Mike Jordan
|
|
|
EnergyJohn @ ###-####Call in advance. U factors on windows ok.
|
GCB-Energy | 5/3/2011 | 5/4/2011 | 5/4/2011 | A | CANC |
Dave Hannah
|
|
|
EnergyJohn @ ###-####Call in advance john will reschedule thi inspection
|
GCB-Energy | 4/26/2011 | 4/27/2011 | 4/27/2011 | A | PART |
Mike Jordan
|
|
|
EnergyJohn @ ###-####Call in advance. Needs to remove all insulation that has fire damage and provide U-factors for glazing.
|
GCB-Framing | 3/15/2011 | 3/16/2011 | 3/16/2011 | A | PASS |
Tom Arcoraci
|
|
|
FramingJohn @ ###-####Call in advance
|
GCB-Framing | 1/21/2011 | 1/24/2011 | 1/24/2011 | A | PART |
Mike Jordan
|
|
|
Scope: Framingcontact: John @ ###-####. More of a building conferance. Needs to get electrical work installed and inspected, complete airseal package. Also neted windows installed are used, must meet .35 max u-factor per nfcr and must be tempered if in hazordous location. Will call back for formal framing inspection once other noted items are completed.
|