GCB-Final | 4/26/2011 | 4/27/2011 | 4/27/2011 | A | PASS |
Dave Hannah
|
|
|
FinalDave @ ###-####Call in advance - PM Inspection
|
GCB-Energy | 3/2/2011 | 3/3/2011 | 3/3/2011 | A | PASS |
Dave Hannah
|
|
|
EnergyDave @ ###-####
|
GCB-Framing | 2/28/2011 | 3/1/2011 | 3/1/2011 | A | PASS |
Dave Hannah
|
|
|
FramingDave @ ###-####Call in advance ok to insulate
|
GCB-Framing | 2/24/2011 | 2/25/2011 | 2/25/2011 | A | FAIL |
Mike Jordan
|
|
|
FramingDave @ ###-####Call in advance. Needs to complete airseal package prior to framing inspections, Appears that mechanical rough in inspection failed. Called contractor approx. 45 minutes prior to arrival.
|
GCB-Framing | 2/9/2011 | 2/10/2011 | 2/10/2011 | A | PART |
Dave Hannah
|
|
|
Framing (Eaves)Dave @ ###-#### sheet rock on soffits within 10 of prop line ok to cover
|
GCB-Framing | 1/11/2011 | 1/12/2011 | 1/11/2011 | A | PASS |
Dave Hannah
|
|
|
Scope: Framing (Shear Nail)Contact: Dave @ ###-####Call in advance please ok to cover ext
|
GCB-Framing | 1/6/2011 | 1/7/2011 | 1/7/2011 | A | FAIL |
Dave Hannah
|
|
|
Scope: Framing (Shear Nail)Contact: Dave @ ###-####Call in advance please no plans on site
|
GCB-Footing | 11/4/2010 | 11/5/2010 | 11/5/2010 | A | PASS |
Mike Jordan
|
|
|
Scope: FootingsContact: Bill @ ###-####Applicant has requested inspection after 9:30 a.m. Footing ok. Also verified with structural engineer that no special inspection is required. 2500psi was used in design.
|