GCB-Final | 6/22/2011 | 6/23/2011 | 6/23/2011 | A | FAIL |
Mike Jordan
|
|
|
FinalPerry @ ###-####Call for access 30 mins in advance - AM inspection. Needs to provide smoke detectors and co2 detector as per IRC sec. R314.3.1 and sec. R315.2
|
GCB-Framing | 4/21/2011 | 4/22/2011 | 4/22/2011 | A | PASS |
Mike Jordan
|
|
|
FramingPerry @ ###-####Call in advance for access
|
GCB-Fndatn/slab ins/fld vent | 3/29/2011 | 3/30/2011 | 3/30/2011 | A | PASS |
Dave Hannah
|
|
|
FoundationGreg @ ###-####Call for access - AM Inspection Please
|
GCB-Footing | 3/28/2011 | 3/29/2011 | 3/29/2011 | A | PASS |
Dave Hannah
|
|
|
FootingsPerry @ ###-####Call for access - AM Inspection Please
|