GCB-Courtesy | 12/5/2012 | 12/7/2012 | 12/7/2012 | A | PASS |
Mike Jordan
|
|
|
Murray @ ###-#### Call in advance. ok to cover framing after electrical rough in inspection.
|
GCB-Fndatn/slab ins/fld vent | 4/10/2012 | 4/10/2012 | 4/10/2012 | P | PASS |
Mike Jordan
|
|
|
Murray @ ###-#### (Inspection for concrete steps) Call in advance
|
GCB-Energy | 10/28/2011 | 10/31/2011 | 10/31/2011 | A | PART |
Mike Jordan
|
|
|
Murray @ ###-####Partial inspection to cover area around garage door. Ok to cover area around garage door and install overhead door.
|
GCB-Framing | 6/3/2011 | 6/6/2011 | 6/6/2011 | A | PASS |
Mike Jordan
|
|
|
FramingMurray @ ###-####Call in advance - AM Inspection prefferably 9 a.m.
|
GCB-Footing | 4/22/2011 | 4/25/2011 | 4/25/2011 | A | PASS |
Dave Hannah
|
|
|
FootingsMurray @ ###-####Call in advance
|
GCB-Fndatn/slab ins/fld vent | 4/22/2011 | 4/25/2011 | 4/25/2011 | A | PASS |
Dave Hannah
|
|
|
FoundationMurray @ ###-####Call in advance
|
GCB-Stem wall | 3/28/2011 | 3/29/2011 | 3/29/2011 | A | PASS |
Dave Hannah
|
|
|
StemwallMurray @ ###-####Call in advance
|
GCB-Footing | 3/28/2011 | 3/29/2011 | 3/29/2011 | A | PASS |
Dave Hannah
|
|
|
FootingsMurray @ ###-####Call in advance
|