GCB-Final | 10/24/2011 | 10/25/2011 | 10/25/2011 | A | PASS |
Dave Hannah
|
|
|
Steve @ ###-####Call for access
|
GCB-Final | 10/20/2011 | 10/21/2011 | 10/21/2011 | A | FAIL |
Dave Hannah
|
|
|
Steve @ ###-####Call for access c/n on site
|
GCB-Framing | 8/30/2011 | 8/31/2011 | 8/31/2011 | A | PASS |
Mike Jordan
|
|
|
Kelly @ ###-####
|
GCB-Energy | 8/25/2011 | 8/26/2011 | 8/26/2011 | A | FAIL |
Mike Jordan
|
|
|
Kelly @ ###-####AM Inspection. Insulation ok, still needs to install straps and washers at garage portal frame.
|
GCB-Framing | 8/19/2011 | 8/22/2011 | 8/22/2011 | A | PART |
Dave Hannah
|
|
|
Kelly @ ###-####AM Inspection ok to insulate after mec r/i is aproved
|
GCB-Shearwall | 8/9/2011 | 8/10/2011 | 8/10/2011 | A | FAIL |
Mike Jordan
|
|
|
Shearwall (nailing)Kelly @ ###-####. Install washers at anchor botls in garage and provide the 1000lbs. straps at header.
|
GCB-Footing | 7/8/2011 | 7/8/2011 | 7/8/2011 | P | PASS |
Mike Jordan
|
|
|
Stemwall ok.
|
GCB-Fndatn/slab ins/fld vent | 7/7/2011 | 7/8/2011 | 7/8/2011 | A | CANC |
Mike Jordan
|
|
|
FoundationShane @ ###-####Call in advance
|
GCB-Footing | 7/6/2011 | 7/7/2011 | 7/7/2011 | A | PART |
Mike Jordan
|
|
|
FootingsRyan @ ###-####Call in Advance. work in progress.
|