GCB-Final | 11/10/2011 | 11/14/2011 | 11/14/2011 | A | PASS |
Mike Jordan
|
|
|
Rich @ ###-####. All issues have been resolved. Structural final ok.
|
GCB-Final | 11/9/2011 | 11/10/2011 | 11/10/2011 | A | FAIL |
Mike Jordan
|
|
|
Rich @ ###-####Call for access. Provide required energy cert. and blower door test results and post. Correction notice posted.
|
GCB-Energy | 8/18/2011 | 8/19/2011 | 8/19/2011 | A | PASS |
Dave Hannah
|
|
|
Josh @ ###-####PM Inspection
|
GCB-Framing | 8/18/2011 | 8/19/2011 | 8/19/2011 | A | PASS |
Dave Hannah
|
|
|
Josh @ ###-####PM Inspection
|
GCB-Framing | 8/17/2011 | 8/18/2011 | 8/19/2011 | A | PASS |
Dave Hannah
|
|
|
Josh @ ###-####
|
GCB-Framing | 8/17/2011 | 8/18/2011 | 8/18/2011 | A | FAIL |
Mike Jordan
|
|
|
Josh @ ###-####. NAiloff simpson hangars in garge, Remove 6x6 post by stairs, install correct length 6x6 post with correct connector, All knee walls and vaulted areas need to be encapsulated. Provide documentation for straps at garage header meting the 1000lbs. requirement.
|
GCB-Framing | 7/14/2011 | 7/15/2011 | 7/15/2011 | A | PART |
Mike Jordan
|
|
|
FramingContractor @ ###-####Call in advance. Building foundation inspection.
|
GCB-Footing | 7/13/2011 | 7/13/2011 | 7/13/2011 | P | PASS |
Mike Jordan
|
|
|
|
GCB-Footing | 7/8/2011 | 7/13/2011 | 7/13/2011 | A | CANC |
Mike Jordan
|
|
|
FootingsBill @ ###-####Call in advance
|
GCB-Footing | 7/8/2011 | 7/12/2011 | 7/12/2011 | A | CANC |
Mike Jordan
|
|
|
FootingsBill @ ###-####Call in advance - 3 PM Inspection
|
GCB-Footing | 7/8/2011 | 7/11/2011 | 7/11/2011 | A | CANC |
Mike Jordan
|
|
|
FootingsBill @ ###-####Call in advance - 3 PM Inspection
|