GCB-Final | 10/27/2011 | 10/28/2011 | 10/28/2011 | A | PASS |
Mike Jordan
|
|
|
Duane @ ###-####Call in advance - AM Inspection. Structural final ok. Additional smoke detector was added and CO2 detectors were installed.
|
GCB-Final | 10/26/2011 | 10/27/2011 | 10/27/2011 | A | FAIL |
Mike Jordan
|
|
|
Duane @ ###-####AM InspectionCall in advance for access. Needs to provide CO2 detectors and one SD.
|
GCB-Framing | 10/14/2011 | 10/17/2011 | 10/17/2011 | A | PASS |
Dave Hannah
|
|
|
Duane @ ###-####AM InspectionCall in advance for access
|
GCB-Energy | 10/12/2011 | 10/13/2011 | 10/13/2011 | A | PASS |
Mike Jordan
|
|
|
Duane @ ###-####AM InspectionCall for Access. ok for cover.
|
GCB-Shearwall | 10/11/2011 | 10/12/2011 | 10/12/2011 | A | PASS |
Dave Hannah
|
|
|
Shear InspectionDuane @ ###-####Call in advance framing also ok ok to insulate
|
GCB-Footing | 9/28/2011 | 9/29/2011 | 9/29/2011 | A | PASS |
Mike Jordan
|
|
|
AM Please. Stemwall ok.
|
GCB-Footing | 9/27/2011 | 9/28/2011 | 9/28/2011 | A | PASS |
Mike Jordan
|
|
|
Dwain ###-####-AM please. Footing ok.
|