GCB-Final | 5/30/2012 | 5/31/2012 | 5/31/2012 | A | PASS |
Jim Sly
|
|
|
Kevin @ ###-#### Structural final OK only........Unable to verify trade finals approved......No card on site.
|
GCB-Energy | 1/5/2012 | 1/6/2012 | 1/6/2012 | A | PASS |
Mike Jordan
|
|
|
steve @ ###-####. All framing and mechanical issues were resolved. ok to cover.
|
GCB-Framing | 12/29/2011 | 12/30/2011 | 12/30/2011 | A | PART |
Dave Hannah
|
|
|
Steve @ ###-####1 pm inspection call in adance c/n on site ok to insulate
|
GCB-Fndatn/slab ins/fld vent | 11/28/2011 | 11/29/2011 | 11/29/2011 | A | PART |
Mike Jordan
|
|
|
Shane @ ###-####PM Inspection
|
GCB-Fndatn/slab ins/fld vent | 11/28/2011 | 11/29/2011 | 11/29/2011 | A | DEFR |
Dave Hannah
|
|
|
Shane @ ###-####PM Inspection
|
GCB-Footing | 11/28/2011 | 11/28/2011 | 11/28/2011 | P | PASS |
Dave Hannah
|
|
|
shane - ###-####
|
GCB-Footing | 11/22/2011 | 11/23/2011 | 11/23/2011 | A | CANC |
Mike Jordan
|
|
|
Ryan @ ###-####PM Inspectioncancelled by contractor.
|