GCB-Final | 2/29/2012 | 3/1/2012 | 3/1/2012 | A | PASS |
Mike Jordan
|
|
|
Sergey @ ###-####Call in advance. Structural final only ok. Not able to verify other required finals. Signed card.
|
GCB-Energy | 1/11/2012 | 1/12/2012 | 1/12/2012 | A | PASS |
Mike Jordan
|
|
|
Sergey @ ###-####Call in avance. All issues resolved. energy ok. Ok to sheet rock.
|
GCB-Framing | 1/9/2012 | 1/10/2012 | 1/10/2012 | A | PART |
Mike Jordan
|
|
|
Sergey @ ###-####Call in advance. Strap top plates from addition to existing structure, complete airseal package, make sur that all existing bedrooms have smoke detectors hardwired and interconnected and provide the required CO2 detector. Ok to insulate. Correction notice issued.
|
GCB-Footing | 11/14/2011 | 11/15/2011 | 11/15/2011 | A | PASS |
Dave Hannah
|
|
|
Yana @ ###-####Call in advance - AM Inspection
|