GCB-Final | 9/5/2012 | 9/6/2012 | 9/6/2012 | A | PASS |
Dave Hannah
|
|
|
Randy @ ###-#### Call in advance
|
GCB-Final | 9/4/2012 | 9/5/2012 | 9/5/2012 | A | FAIL |
Dave Hannah
|
|
|
Randy @ ###-#### Call in advance needs to move sicks in restrooms
|
GCB-Final | 8/30/2012 | 8/31/2012 | 8/31/2012 | A | CANC |
Jim Sly
|
|
|
Randy @ ###-#### Fire Dept. will be completing Final Inspection in morning No time spent.....No inspection completed... Contr cancelled ......
|
GCB-Ceiling Grid | 8/15/2012 | 8/16/2012 | 8/16/2012 | A | PART |
Dave Hannah
|
|
|
Randy @ ###-#### AM inspection requested ok after mec oks
|
GCB-Ceiling Grid | 8/15/2012 | 8/15/2012 | 8/15/2012 | P | PART |
Mike Jordan
|
|
|
Randy @ ###-#### PM Inspection. Grid ok. contractor installing wires to diffusers.
|
GCB-Ceiling Grid | 8/13/2012 | 8/14/2012 | 8/15/2012 | P | NR |
Dave Hannah
|
|
|
Randy @ ###-#### PM Inspection needs to finish lights and get elec rough in
|
GCB-Framing | 7/10/2012 | 7/11/2012 | 7/11/2012 | P | PART |
Tony Young
|
|
|
Randy @ ###-#### PM Inspection,, frame ok,, need seal at top plates for energy and fireblock
|
GCB-Courtesy | 7/5/2012 | 7/6/2012 | 7/6/2012 | A | PASS |
Dave Hannah
|
|
|
Randy @ ###-#### Call 1 hour in advance
|
GCB-Energy | 7/12/2012 | 7/12/2012 | | P | |
Dave Hannah
|
|
|
Randy @ ###-#### PM inspection for today please.
|