GCB-Final | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Mike Jordan
|
|
|
Bob ###-####. Structural final only ok. Tempered windows have been installed. No card on site to sign. Could not verify other trades final at this time.
|
GCB-Final | 2/27/2014 | 2/28/2014 | 2/28/2014 | A | FAIL |
Jim Storey
|
|
|
Site contact, Bob: ###-####, Please check records for energy inspection and advise Garden City..saftey glass back door less than 24 inches from door.
|
GCB-Framing | 10/22/2013 | 10/23/2013 | 10/23/2013 | P | PASS |
Tom Arcoraci
|
|
|
Bob ###-####
|
GCB-Framing | 10/18/2013 | 10/18/2013 | 10/18/2013 | P | PART |
Mike Jordan
|
|
|
Bob ###-####. Ok to insulate. Still need 5/8type x behind tub on one side.
|
GCB-Framing | 10/16/2013 | 10/16/2013 | 10/17/2013 | P | CANC |
Mike Jordan
|
|
|
Bob ###-####
|
GCB-Framing | 10/16/2013 | 10/16/2013 | 10/16/2013 | P | FAIL |
Mike Jordan
|
|
|
Provide mech. rough in inspection. Install 5/8 type x rock behind shower/tub for 1hr. firewall continuity. Firecaulk lowvoltage at 1hr. firewall. Correction notice posted
|
GCB-Shearwall | 9/13/2013 | 9/16/2013 | 9/16/2013 | P | PASS |
Jim Sly
|
|
|
Bob ###-####
|
GCB-Fndatn/slab ins/fld vent | 7/26/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Mike Jordan
|
|
|
###-#### Heron
|
GCB-Footing | 7/26/2013 | 7/26/2013 | 7/26/2013 | P | PASS |
Tom Arcoraci
|
|
|
Heron ###-####
|
GCB-Footing | 7/22/2013 | 7/22/2013 | 7/22/2013 | P | NR |
Mike Jordan
|
|
|
Heron Phone #: ###-####
|
GCB-Footing | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | CANC |
Tom Arcoraci
|
|
|
|
GCB-Footing | 7/19/2013 | 7/19/2013 | 7/19/2013 | A | CANC |
Tom Arcoraci
|
|
|
Heron ###-####
|
GCB-Fndatn/slab ins/fld vent | 7/12/2013 | 7/16/2013 | 7/16/2013 | P | NR |
Tom Arcoraci
|
|
|
Heron ###-####
|
GCB-Footing | 7/12/2013 | 7/16/2013 | 7/16/2013 | A | CANC |
Tom Arcoraci
|
|
|
Heron ###-####
|
GCB-Footing | 7/11/2013 | 7/11/2013 | 7/11/2013 | P | CANC |
Tom Arcoraci
|
|
|
Heron ###-####
|