GCB-Final | 10/1/2012 | 10/1/2012 | 10/1/2012 | P | PASS |
Dave Hannah
|
|
|
Trinity @ ###-####
|
GCB-Framing | 6/29/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Jim Sly
|
|
|
Kevin @ ###-#### PM inspection requested
|
GCB-Energy | 6/29/2012 | 7/2/2012 | 7/2/2012 | P | PASS |
Jim Sly
|
|
|
Kevin @ ###-#### PM inspection requested
|
GCB-Framing | 6/28/2012 | 6/28/2012 | 6/28/2012 | P | FAIL |
Jim Sly
|
|
|
Kevin @ ###-#### Correction notice posted.
|
GCB-Framing | 6/26/2012 | 6/27/2012 | 6/27/2012 | P | FAIL |
Mike Jordan
|
|
|
Kevin @ ###-#### PM Inspection. Provide truss engineering, Portal frame required at dinning roonm window as shown on approved plans, shear nailing not completed, several areas not nailed off at 48" required length as shown on approved plans. fireblock pop outs at garge and justiff oversized hole in portal frame shear panel at garage. Correction notice posted. Do not cover.
|
GCB-Fndatn/slab ins/fld vent | 5/14/2012 | 5/15/2012 | 5/15/2012 | A | CANC |
Jim Sly
|
|
|
Shane @ ###-#### AM Inspection
|
GCB-Fndatn/slab ins/fld vent | 5/14/2012 | 5/15/2012 | 5/15/2012 | A | PASS |
Jim Sly
|
|
|
Shane @ ###-#### AM InspectonAM Inspection
|
GCB-Footing | 5/11/2012 | 5/14/2012 | 5/14/2012 | P | PASS |
Tom Arcoraci
|
|
|
Ryan @ ###-#### PM Inspection
|