GCB-Final | 11/13/2012 | 11/14/2012 | 11/14/2012 | A | PASS |
Tom Arcoraci
|
|
|
Cody @ ###-#### Call for access bld final ok tma
|
GCB-Framing | 7/26/2012 | 7/27/2012 | 7/27/2012 | A | PASS |
Mike Jordan
|
|
|
Cody @ ###-####. All framing issues resolved. ok to cover.
|
GCB-Energy | 7/25/2012 | 7/26/2012 | 7/26/2012 | A | NR |
Mike Jordan
|
|
|
Cody @ ###-####
|
GCB-Framing | 7/25/2012 | 7/26/2012 | 7/26/2012 | A | FAIL |
Mike Jordan
|
|
|
Cody @ ###-####. Renail portal frame with 3 inch pattern as shown on plans. See approved plans for areas missed and additional blocking that was missed. Do not cover interior or exterior. Correction notice posted.
|
GCB-Energy | 7/23/2012 | 7/24/2012 | 7/25/2012 | P | NR |
Dave Hannah
|
|
|
Cody @ ###-#### PM Inspection
|
GCB-Framing | 7/23/2012 | 7/24/2012 | 7/25/2012 | P | FAIL |
Dave Hannah
|
|
|
Cody @ ###-#### PM Inspection c/n items note completed
|
GCB-Framing | 7/19/2012 | 7/20/2012 | 7/20/2012 | A | FAIL |
Mike Jordan
|
|
|
Cody @ ###-####. Roll block interior bearing on trusses T05. Provide the required nailing on bottom chord of 3 ply T06 truss and the addtional 10d nails as noted on the truss engineering. Strap top plate at plumbing penetration, interior wall at closet. Fire block at fireplace deck on interior walls. Remove exterior house wrap for shear nail inspection. Correction notice posted. ok to insulate.
|
GCB-Fndatn/slab ins/fld vent | 6/13/2012 | 6/15/2012 | 6/17/2012 | A | PASS |
Jim Sly
|
|
|
Bill @ ###-####
|
GCB-Footing | 6/13/2012 | 6/14/2012 | 6/14/2012 | A | PASS |
Dave Hannah
|
|
|
Bill @ ###-####
|