GCB-Final | 9/27/2012 | 9/27/2012 | 9/27/2012 | P | PASS |
Mike Jordan
|
|
|
Chi @ ###-#### call for access. Structural final only ok. All issues were resolved. Can not verify other trades final. Card was signed.
|
GCB-Final | 9/26/2012 | 9/27/2012 | 9/27/2012 | A | NR |
Dave Hannah
|
|
|
Chi @ ###-#### call for access AM inspection requested
|
GCB-Final | 9/24/2012 | 9/25/2012 | 9/25/2012 | A | FAIL |
Mike Jordan
|
|
|
Chi @ ###-#### Call for access. Needs to provide the required energy cert and post. Also provide the blower door test results and post or the 3rd. party airseal inspection report done at framing stage. Correction notice was posted.
|
GCB-Framing | 8/23/2012 | 8/24/2012 | 8/24/2012 | A | DONE |
Jim Sly
|
|
|
Chi @ ###-#### Soffat and sheetrock inspection Sheetrock on soffits completed on East and West sides.
|
GCB-Framing | 8/22/2012 | 8/22/2012 | 8/22/2012 | P | PART |
Jim Sly
|
|
|
Chi @ ###-#### Soffat and Sheet rock inspection PM inspection for today requested. All OK except East side .....2nd story.
|
GCB-Framing | 8/20/2012 | 8/21/2012 | 8/21/2012 | P | FAIL |
Jim Sly
|
|
|
Chi @ ###-#### Soffett inspection Unable to complete inspection of fire resistive construction ....in close proximity to property line. No approved plans on site.
|
GCB-Energy | 8/10/2012 | 8/10/2012 | 8/10/2012 | P | PASS |
Tony Young
|
|
|
Chi @ ###-#### Afternoon inspection requested for today.
|
GCB-Framing | 8/7/2012 | 8/8/2012 | 8/8/2012 | P | PASS |
Mike Jordan
|
|
|
###-####. framing and shear inspection ok.
|
GCB-Fndatn/slab ins/fld vent | 7/11/2012 | 7/12/2012 | 7/12/2012 | P | PASS |
Mike Jordan
|
|
|
Ryan @ ###-#### PM Inspection
|
GCB-Footing | 7/10/2012 | 7/11/2012 | 7/11/2012 | A | PASS |
Mike Jordan
|
|
|
Ryan @ ###-####
|
GCB-Footing | 7/9/2012 | 7/10/2012 | 7/10/2012 | A | NR |
Mike Jordan
|
|
|
Ryan @ ###-####. not ready. Will need to reschedule.
|
GCB-Footing | 7/6/2012 | 7/9/2012 | 7/9/2012 | P | CANC |
Mike Jordan
|
|
|
Ryan @ ###-#### PM Inspection. on site, no forms or concrete crew.
|