GCB-Final | 1/17/2013 | 1/18/2013 | 1/22/2013 | P | PASS |
Jim Sly
|
|
|
JON ###-#### Unable to determine if all other permits or agencies have finaled. Structural final only......OK.
|
GCB-Energy | 11/7/2012 | 11/7/2012 | 11/7/2012 | P | PASS |
Jim Sly
|
|
|
John @ ###-####
|
GCB-Framing | 11/7/2012 | 11/7/2012 | 11/7/2012 | P | PASS |
Jim Sly
|
|
|
John @ ###-####
|
GCB-Energy | 10/24/2012 | 10/24/2012 | 10/24/2012 | P | PART |
Mike Jordan
|
|
|
Trenidy @ ###-####. Energy ok. Will be ok to cover after mech. rough in inspection has passed. A correction notice was posted noting to not cover until mechanical rough in has passed.
|
GCB-Framing | 10/22/2012 | 10/22/2012 | 10/22/2012 | P | PASS |
Jim Sly
|
|
|
Trenidy @ ###-#### Frame and Shear nailing....OK
|
GCB-Framing | 10/19/2012 | 10/22/2012 | 10/22/2012 | A | NR |
Dave Hannah
|
|
|
Trenidy @ ###-####
|
GCB-Fndatn/slab ins/fld vent | 9/25/2012 | 9/25/2012 | 9/26/2012 | P | DONE |
Dave Hannah
|
|
|
Dane @ ###-####
|
GCB-Fndatn/slab ins/fld vent | 9/25/2012 | 9/25/2012 | 9/25/2012 | P | PASS |
Tony Young
|
|
|
|
GCB-Fndatn/slab ins/fld vent | 9/24/2012 | 9/25/2012 | 9/25/2012 | A | NR |
Mike Jordan
|
|
|
Ryan @ ###-####. No one on site. Footing forms forms still in place, stemwall forms not yet constructed. Will need to reschedule.
|
GCB-Footing | 9/21/2012 | 9/24/2012 | 9/24/2012 | P | PASS |
Tony Young
|
|
|
Ryan @ ###-#### PM inspection requested.
|