GCB-Final | 4/24/2013 | 4/26/2013 | 4/26/2013 | A | PASS |
Tony Young
|
|
|
John ###-#### door unlocked
|
GCB-Energy | 2/28/2013 | 3/1/2013 | 3/1/2013 | P | PASS |
Jim Sly
|
|
|
John ###-#### Note: Talked to John about Egress window Master Bed.
|
GCB-Framing | 2/28/2013 | 2/28/2013 | 2/28/2013 | P | PART |
Tony Young
|
|
|
John ###-####,, need truss bracing nailed at 6" oc,, egress yet to happen,, still ok to insulate
|
GCB-Framing | 2/26/2013 | 2/27/2013 | 2/27/2013 | A | FAIL |
Tony Young
|
|
|
John ###-####,,, correction posted,, ok to insulate
|
GCB-Fndatn/slab ins/fld vent | 1/28/2013 | 1/29/2013 | 1/29/2013 | P | PASS |
Tony Young
|
|
|
Shane @ ###-#### PM Inspection
|
GCB-Footing | 1/25/2013 | 1/28/2013 | 1/28/2013 | A | PASS |
Mike Jordan
|
|
|
Ryan @ ###-#### Call in advance
|
GCB-Footing | 1/18/2013 | 1/23/2013 | 1/23/2013 | A | NR |
Jim Sly
|
|
|
Ryan ###-#### No work going on this lot.....No telephone call from concrete co. or job superintenden to let us know they were not pouring today..
|