GCB-Final | 11/18/2013 | 11/19/2013 | 11/19/2013 | P | PASS |
Jim Sly
|
|
|
Josh ###-#### Call first Structural final only....OK.
|
GCB-Energy | 8/5/2013 | 8/5/2013 | 8/5/2013 | P | PASS |
Jim Sly
|
|
|
Josh ###-####
|
GCB-Framing | 8/2/2013 | 8/2/2013 | 8/2/2013 | P | PART |
Mike Jordan
|
|
|
Josh ###-####. ok to insulate.
|
GCB-Framing | 7/31/2013 | 8/1/2013 | 8/1/2013 | A | FAIL |
Mike Jordan
|
|
|
Josh ###-####. Complete lateral bracing on C1 and C2P trusses, remove all nonrated boxes from 1 and 2hr walls. Neeeds mech ri inspections.
|
GCB-Courtesy | 7/24/2013 | 7/24/2013 | 7/24/2013 | P | PASS |
Tom Arcoraci
|
|
|
Please call first Phone #: ###-####
|
GCB-Shearwall | 7/19/2013 | 7/19/2013 | 7/19/2013 | P | PASS |
Tom Arcoraci
|
|
|
Josh ###-#### call first
|
GCB-Framing | 6/27/2013 | 6/28/2013 | 6/28/2013 | A | PART |
Jim Sly
|
|
|
Josh ###-#### All Nailing for shear and 2hr wall OK at all concealed spaces at all boxed pop outs....Rear and gar. fronts. Note: Need retro fit HD's @ Gar. front portal.
|
GCB-Fndatn/slab ins/fld vent | 5/6/2013 | 5/6/2013 | 5/7/2013 | P | PASS |
Jim Sly
|
|
|
Mana ###-####
|
GCB-Fndatn/slab ins/fld vent | 5/3/2013 | 5/3/2013 | 5/3/2013 | P | NR |
Jim Sly
|
|
|
Mana ###-####
|
GCB-Footing | 4/30/2013 | 5/1/2013 | 5/1/2013 | A | PART |
Mike Jordan
|
|
|
MANA ###-#### Between 9-10. Needs to replace some form boards to meet min. footing depths.
|
GCB-Footing | 4/29/2013 | 4/29/2013 | 4/29/2013 | P | CANC |
Tony Young
|
|
|
MANA ###-####
|