GCB-Final | 7/8/2013 | 7/8/2013 | 7/8/2013 | P | PASS |
Tony Young
|
|
|
Bill ###-####
|
GCB-Fndatn/slab ins/fld vent | 6/28/2013 | 6/28/2013 | 6/28/2013 | P | PASS |
Mike Jordan
|
|
|
William ###-#### Footing inspect. remainder of post footings ok.
|
GCB-Footing | 4/19/2013 | 4/19/2013 | 4/19/2013 | P | PART |
Jim Sly
|
|
|
William ###-#### please call 1/2 hour advance Partial insp of approx 360 sq ft of structure. location is approx 17' from S. setback (rear) and 5' 6" from W. setback (side).
|
GCB-Courtesy | 4/11/2013 | 4/12/2013 | 4/15/2013 | A | PEND |
Jim Sly
|
|
|
William ###-#### please call half hour before arrival Met contractor at site. Unable to determine front 20' setback. No pins or string lines set. Notified Leon at Garden City.
|