Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberGCB13-00044
StatusFinaled
Name Blackstead Building Co.
Site Address 5849 N DUXBURY PIER LN
Project NameBLD2013-00044
Customer Number 
ePlanReviewNo
Description
(Townhome 'B') - To construct a new 1,897 square foot, one story, two bedroom, two and a 1/2 bathrooms, single family dwelling townhouse with a 566 square foot attached two car garage, a 408 square foot courtyard, and a 178 square foot covered rear patio. All work per the approved plans, attached plan review report, Engineering, and all other reviewing agencies approvals. 1-hour fire-resistance construction is required on all projections closer than 3 feet to the property line. Distance to property line for fire rated construction is measured from the finished exterior of the exterior wall. Any walls less than 3' from the property line are required to have 1-hour fire-resistance construction. This structure is located in the floodplain. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final10/11/201310/11/201310/11/2013PPASS
DetailsTom Arcoraci
Brayden ###-#### structural final ok tma
GCB-Final10/10/201310/11/201310/11/2013PFAIL
DetailsMike Jordan
Brayden ###-#### Call first. Needs to provide the blower door test results and post or the 3rd. party airseal inspection report. Also needs to post the required energy cert. information and post.
GCB-Final9/25/20139/26/20139/26/2013PNR
DetailsMike Jordan
Braydon ###-#### call first
GCB-Energy7/25/20137/26/20137/26/2013APASS
DetailsMike Jordan
Braydon ###-####
GCB-Framing7/24/20137/24/20137/24/2013PPASS
DetailsMike Jordan
Braydon ###-#### After 2:30 Call first. Wall bracing ok. Framing ok. ok to insulate.
GCB-Framing7/22/20137/23/20137/23/2013AFAIL
DetailsMike Jordan
Provide truss engineering, Elec. rough in inspection not passed. Eaves at 2hr. wall recieve 2 layers of 5/8 type x rock at soffitt? Per approved plans and engineering for wall bracing, it appeatrs that all panel edges should be blocked? Correction notice posted
GCB-Framing7/15/20137/15/20137/15/2013PNR
DetailsJim Sly
Braydon ###-####
GCB-Shearwall7/3/20137/3/20137/3/2013PNR
DetailsDave Hannah
Braydon ###-#### Call for entry instructions
GCB-Fire Wall6/10/20136/11/20136/11/2013PPASS
DetailsMike Jordan
###-####. 2hr. fire wall, 5/8 type x rock, base and face layers on side only, insulation and framing on 2hr.walls ok.
GCB-Fndatn/slab ins/fld vent5/17/20135/17/20135/17/2013APASS
DetailsDave Hannah
Adam ###-####