GCB-Final | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Mike Jordan
|
|
|
Bob ###-####. Structural final only ok. Tempered windows have been installed. No card on site to sign. Could not verify other trades final at this time.
|
GCB-Final | 2/27/2014 | 2/28/2014 | 2/28/2014 | A | FAIL |
Jim Storey
|
|
|
Site contact, Bob: ###-####, Please check records for energy inspection and advise Garden City..saftey glass back door less than 24 inches from door.
|
GCB-Framing | 11/25/2013 | 11/25/2013 | 11/25/2013 | P | PASS |
Dave Hannah
|
|
|
Stacey ###-####
|
GCB-Framing | 11/18/2013 | 11/19/2013 | 11/19/2013 | P | NR |
Mike Jordan
|
|
|
Bob ###-####. Needs other trades first.
|
GCB-Shearwall | 10/16/2013 | 10/16/2013 | 10/16/2013 | P | PASS |
Mike Jordan
|
|
|
Bob ###-####. Exterior wall bracing only ok.
|
GCB-Shearwall | 10/10/2013 | 10/10/2013 | 10/10/2013 | P | FAIL |
Mike Jordan
|
|
|
Bob ###-####. Provide approved set of plans and provide temp. addressing for units. Coreection notice posted.
|
GCB-Fndatn/slab ins/fld vent | 8/5/2013 | 8/6/2013 | 8/6/2013 | A | NR |
Mike Jordan
|
|
|
Huron ###-####. no crew on site. forms for foundation not yet erected.
|
GCB-Footing | 8/5/2013 | 8/5/2013 | 8/5/2013 | P | PASS |
Jim Storey
|
|
|
Huron ###-#### plan to pour at 3:30
|
GCB-Footing | 7/29/2013 | 7/30/2013 | 7/30/2013 | A | NR |
Mike Jordan
|
|
|
Heron ###-####. no forms installed, no concrete crew on site.
|