GCB-Final | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | PASS |
Dave Hannah
|
|
|
Vince ###-####
|
GCB-Final | 1/24/2014 | 1/24/2014 | 1/24/2014 | P | FAIL |
Mike Jordan
|
|
|
BJ ###-####. Provide code compliant handrail, co detector at bottom of stairs, post required energy cert and provide blower door test results or the 3rd party inspection airseal report. Correction notice posted.
|
GCB-Energy | 12/4/2013 | 12/5/2013 | 12/5/2013 | A | PASS |
Jim Sly
|
|
|
###-#### Vince
|
GCB-Framing | 12/3/2013 | 12/3/2013 | 12/3/2013 | P | PASS |
Tony Young
|
|
|
vince ###-####,, ok to insulate
|
GCB-Footing | 11/15/2013 | 11/15/2013 | 11/15/2013 | P | PASS |
Jim Sly
|
|
|
Talked to Mike Jordan. He said he looked at footings later that day when Contr was ready......and said they looked good. He forgot to enter a new inspection. Mike's OK with a Pass.
|
GCB-Shearwall | 11/14/2013 | 11/15/2013 | 11/15/2013 | A | PASS |
Jim Sly
|
|
|
Vince ###-####
|
GCB-Fndatn/slab ins/fld vent | 10/18/2013 | 10/21/2013 | 10/21/2013 | A | PASS |
Jim Sly
|
|
|
Anton ###-#### Concrete at 9AM
|
GCB-Footing | 10/17/2013 | 10/18/2013 | 10/18/2013 | A | NR |
Mike Jordan
|
|
|
Antoine ###-####. no one on site. no plans, property lines not strung, no form boards in place.
|