GCB-Final | 4/21/2014 | 4/22/2014 | 4/22/2014 | P | PASS |
Jim Sly
|
|
|
Willie ###-#### Met with Andy from Clements Concrete and Aggregate concrete construction. We excavated to the footing and performed (4) rebound tests. The average of the four tests was 3229 psi (729 psi better than code). Blower door test perfomed by Momentum.........Pass at 4.7
|
GCB-Final | 4/21/2014 | 4/21/2014 | 4/21/2014 | P | FAIL |
Mike Jordan
|
|
|
Willie ###-####. Neees to provide the blower door test result or the 3rd party airseal inspection report and post. Also need the additional testing results for the footing when placed, for not following cold westher concrete construction.
|
GCB-Energy | 1/29/2014 | 1/30/2014 | 1/30/2014 | A | PASS |
Mike Jordan
|
|
|
Willie ###-####. ok to sheet rock. Also spoke to willie rwgarding the additional testing for foundation system when placed due to cold weather concrete placement criteria not followed.
|
GCB-Framing | 1/27/2014 | 1/28/2014 | 1/28/2014 | A | PASS |
Jim Sly
|
|
|
Willie ###-####
|
GCB-Shearwall | 1/9/2014 | 1/9/2014 | 1/10/2014 | P | PASS |
Dave Hannah
|
|
|
Willie ###-####
|
GCB-Fndatn/slab ins/fld vent | 12/16/2013 | 12/18/2013 | 12/18/2013 | P | FAIL |
Mike Jordan
|
|
|
Huron ###-####. conc. in stemwall already placed. Footing concrete placed yesterday 12-17-13. cold wheather conc. proceedures not followed. Surface temp of concrete must maintain 50 F. for72hrs. Called Heron and noted to him that additional testing is required to show concrete has made 2500 psi.
|
GCB-Footing | 12/16/2013 | 12/17/2013 | 12/18/2013 | P | PASS |
Jim Sly
|
|
|
Huron ###-#### plan to pour at 3:30
|