Permit Information
Permit NumberGCB13-00155
StatusFinaled
Name Red Oak Development
Site Address 6359 N MYSTIC COVE
Project NameBLD2013-00153
Customer Number 
ePlanReviewNo
Description
To construct a new 1,995 square foot, one story, three bedroom, two bathroom, single family dwelling with a 644 square foot attached garage, a 41 square foot covered front porch, and a 150 square foot covered rear patio. All work per the approved plans, attached plan review report, and all other reviewing agencies approvals. FEMA (LOMR-F) Case No.: 10-10-0983A noted on plans removing this property from the floodplain. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
GCB-Final4/21/20144/22/20144/22/2014PPASS
DetailsJim Sly
Willie ###-####
Met with Andy from Clements Concrete and Aggregate concrete construction. We excavated to the footing and performed (4) rebound tests. The average of the four tests was 3229 psi (729 psi better than code). Blower door test perfomed by Momentum.........Pass at 4.7
GCB-Final4/21/20144/21/20144/21/2014PFAIL
DetailsMike Jordan
Willie ###-####. Neees to provide the blower door test result or the 3rd party airseal inspection report and post. Also need the additional testing results for the footing when placed, for not following cold westher concrete construction.
GCB-Energy1/29/20141/30/20141/30/2014APASS
DetailsMike Jordan
Willie ###-####. ok to sheet rock. Also spoke to willie rwgarding the additional testing for foundation system when placed due to cold weather concrete placement criteria not followed.
GCB-Framing1/27/20141/28/20141/28/2014APASS
DetailsJim Sly
Willie ###-####
GCB-Shearwall1/9/20141/9/20141/10/2014PPASS
DetailsDave Hannah
Willie ###-####
GCB-Fndatn/slab ins/fld vent12/16/201312/18/201312/18/2013PFAIL
DetailsMike Jordan
Huron ###-####. conc. in stemwall already placed. Footing concrete placed yesterday 12-17-13. cold wheather conc. proceedures not followed. Surface temp of concrete must maintain 50 F. for72hrs. Called Heron and noted to him that additional testing is required to show concrete has made 2500 psi.
GCB-Footing12/16/201312/17/201312/18/2013PPASS
DetailsJim Sly
Huron ###-#### plan to pour at 3:30